Development in Monterey Park
Keep up with new development throughout the city by checking this page periodically. On this page you can find descriptions of new and ongoing development projects in the city along with project exhibits and environmental information.
Current Projects
Monterey Park Towne Centre will be located on the southeast corner of Garfield Avenue and Garvey Avenue. The first and second floor of the new five story building will be dedicated to retail uses, while the top three floors will consist of residential condominiums. Two levels of subterranean parking will be located directly under the new building.
Monterey Park Towne Centre Precise Plan
- Title Page and Table of Contents
- I. Introduction (PDF)
- II. General Plan Goals (PDF)
- III. New General Plan Policies and Implementation (PDF)
- IV. Project Objectives (PDF)
- V. Project Description (PDF)
- VI. Development Guidelines and Standards (PDF)
- VII. Implementation Procedures (PDF)
- VIII. Conclusion (PDF)
Monterey Park Market Place SEIR
Monterey Park Market Place will be located on the southwest side of the Saturn Drive and Potrero Grande Drive intersection. The development will result in a new retail shopping center in the southeastern portion of the city. A supplemental EIR was conducted for this project and is available for public review by following the links below.
- Title and Table of Contents (PDF)
- Executive Summary (PDF)
- Introduction (PDF)
- Project Description (PDF)
- Environmental Setting (PDF)
- Environmental Analysis
- Aesthestics (PDF)
- Air Quality (PDF)
- Greenhouse Gas (PDF)
- Noise (PDF)
- Transportation and Traffic Part 1 (PDF) and Part 2 (PDF)
- Utilities and Service Systems (PDF)
- Significant Unavoidable Impacts (PDF)
- Alternatives to the Proposed Project (PDF)
- Impacts Found Not to Be Significant (PDF)
- Significant Irreversible Changes Due to the Proposed Project (PDF)
- Growth-Inducing Impacts of the Proposed Project (PDF)
- Organizations and Persons Consulted (PDF)
- Qualifications of Persons Preparing the EIR (PDF)
- Bibliography (PDF)
Appendices
- Appendix A - Initial Study and Notice of Preparation (PDF)
- Appendix B - Initial Study and NOP Comments (PDF)
- Appendix C - Air Quality and Greenhouse Gas Modeling (PDF)
- Appendix D - Noise Modeling (PDF)
- Appendix E1 - Traffic Impact Assesment (PDF)
- Appendix E2 - Technical Memorandum (PDF)
- Appendix F - Draft Water Supply Assessment
- Appendix G - Preliminary Hydrology and Stormwater Drainage Study (PDF)