You will need a permit to work on the sewer. This permit also covers construction and alterations. Applicants must pick-up an original construction permit application (PDF) form from the Engineering Division Counter, located on the 1st floor of City Hall.
Fees
Permit Fee
There is a $727.00 per connection fee inside the city. The outside city fee is $978.00.
Penalty Fee
A $1454.00 fee will be assessed for work performed without a permit inside the city, and a $1956.00 fee for outside the city.
Insurance
You need a minimum of $2,000,000 liability and $100,000 property together with Worker's Compensation. The city must be named as additional insured.